Africa Mali Steel Structure Warehouse Project
Africa Mali Steel Structure Warehouse Project
2022-04-11
The steel structure export project in Mali, Africa is one of the export orders of Hongye Steel Structure in 2016. The project consists of two two steel structure buildings, one is a steel structure workshop and the other is a steel structure warehouse, with a total of 10062 square meters Meter. The owner is a big trader in Mali, who often goes on business trips all over the world. To expand his business, he entrusted a Malian who opened a trading company in China to help them find a steel structure factory. The representative of the foreign trade company, Acan, went through many comparisons and visits. After the inspection, it is believed that the product quality of our Hongye steel structure is qualified and cost-effective, so we recommended our company to the owner.

The workshop area is more than 10,000 square meters, the span is large and the difficulty is high, so the steel structure is an inevitable choice. Due to the local climate, the owner requires better insulation of the steel structure warehouse, so the roof tiles and exterior wall panels use color steel rock wool sandwich tiles, which not only greatly reduces the temperature in the workshop, but also makes the staff more comfortable in the factory. The roof purlins, wall purlins, and floor decks are made of galvanized C-shaped steel. Galvanized C-shaped steel refers to high-strength steel plates, which are cold-formed and roll-formed. Compared with the same strength, hot rolling can save 30% of material. And long service life, corrosion resistance and durability, it is a galvanized steel with the strongest protection.

We suggest that the owner send our engineers to guide the installation, but the owner believes that the local workers can complete the installation. Later, due to the unskilled operation of the local workers, the materials are damaged, and the owner can only re-purchase from us, which greatly delayed the construction period . In the later stage, the owner assigned our company's own construction team to the steel structure warehouse for on-site installation. Each worker master has rich experience in assembly, directly manages scheduling, insists on holding morning meetings every day, and arranges work division. The team thoroughly understood every construction difficulty, delivered on time according to the owner's requirements, successfully completed the installation, and finally completed the acceptance within the time required by the owner, and the owner was able to put it into production and use on time.

Related News
Nigeria Steel Structure Engineering 2022-04-06 648
Philippine steel structure 4S shop export package installation 2022-04-06 606
Design and installation of steel structure warehouse in Ghana 2022-04-30 1416
DRC customers visit again 2022-04-14 1365
Guangzhou steel structure workshop 2022-04-13 1233
Huizhou Steel Structure Warehouse 2022-04-13 1074
Jamaica Steel Structure Supermarket 2022-04-11 1117
Nigeria factory with crane 2022-04-09 745
Israel Steel Structure Factory 2022-04-09 711
Saipan Steel Structure Supermarket Project 2022-04-08 725
Philippines Steel Structure Power Plant Project 2022-04-08 561
Steel structure exported to Thailand 2022-04-07 714
Exported to the United States for steel structure workshop installation 2022-04-07 449